Wind power projects are across the Landscapes now in and around Kincardine Ont,Canada.
Despite of some local rejection from cottagers along lake Huron with thier signs posted at their end of the driveways stating " Stop The Wind Mills" it seems there is no stop in erecting these industrial wind generators.
The first built in 1995 produces 600 Kilawatts of power a Tacke Turbine. In 2002 five more were put up a Danish made turbine 1.8 MW Vestas .
Across the Bruce Township are now 110 wind turbines that have been producing power for about two years.
At full capacity the Vistas 1.65MW wind turbines can produce up to 190- Megawatts which is enough electricity to power more tan 60 homes.
Monday, August 30, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment